General use
Buying, retiring or claiming for any voluntary purpose.The project is under watch: the registry put it on hold or withdrew it, or an AI-proposed integrity event is in its dispute window.
See what the contracts say to a claimant, a seller and an integrator right now, next to what happened when the same calls were sent on-chain.
The project is under watch: the registry put it on hold or withdrew it, or an AI-proposed integrity event is in its dispute window.
The project is under watch: the registry put it on hold or withdrew it, or an AI-proposed integrity event is in its dispute window.
The project is under watch: the registry put it on hold or withdrew it, or an AI-proposed integrity event is in its dispute window.
The project is under watch: the registry put it on hold or withdrew it, or an AI-proposed integrity event is in its dispute window.
Every event ever opened for this project, oldest first. AI-proposed events are evidence for review, not findings: they act only after a reviewer countersigns or the dispute window closes.
The registry put the project on hold.
Active since 23 Oct 2026, 10:05 UTC.From issuance to claims, read from Verra's registry on 21 Oct 2026 and from the contracts now.
| Beneficiary, as published by the registry | Tonnes | Retirements |
|---|---|---|
| Not disclosed | 18,408 | 18 |
| Retired on behalf of Goodman Tajo Logistics (Spain) SL for the development of Paterna I Logistics Centre | 3,823 | 1 |
Names appear exactly as the registry publishes them; personal ID numbers are redacted. A name here says nothing about that buyer's conduct.
The project's status comes from Verra's own API response, proven with a zkTLS proof and verified inside RegistryOracle. The request it accepts is pinned byte for byte: URL, method, headers, body and the extraction pattern.
No retirement of this project has been proven yet.
Sentinel-2 dry-season composites inside the boundary filed with the Verra registry, 2023 against 2025. The detector flags canopy loss pixel by pixel; Hansen Global Forest Change is the independent yardstick.
2023 dry season
2025 dry season
Detected lossPre-registered rule not met (validFraction >= 0.5 AND (lossPct >= 1.0 OR lossHa >= 1000)); no event proposed.
Detected 512 ha against 324 ha in Hansen; 76.4% of forest pixels had clear observations.
The notice reader extracts events from public statements. Every quote below occurs verbatim in the source document; outputs that cannot be traced to the text are rejected.
All three projects are on the Verra registry, listed as “On hold”.
Verra suspended all three projects eight days after the Federal Police launched Operation Greenwashing, launched in June 2024.
Verra put the two projects on hold shortly after Operation Greenwashing. Verra also put another of Stoppe’s projects, the Evergreen REDD project, on hold.
The projects are the Unitor REDD+ Project (Verra Project 2508), Fortaleza Ituxi REDD Project (Verra Project 1654), and Evergreen REDD+ Project (Verra Project 2539).
The projects are now placed “on hold” on the Verra Registry.
Everything sent on-chain about this project, including the calls the contracts refused on purpose.
| What | By | Result | Transaction |
|---|---|---|---|
| Registry status proven 2508 ON_HOLD RegistryOracle.submitProjectStatus | watcher | Accepted | 0xb7416116…0b624cad |