Recourse
Recall boardVCS 2252BrazilVM0015 (Version NA)

Rio Anapu-Pacaja REDD Project

Watch
Rio Anapu-Pacaja REDD Project is on hold at Verra.It was last retired on 17 Sep 2026. New claims and deliveries are refused, and escrowed purchases stay frozen until the hold is lifted or a recall is confirmed.
Verra registry page

Try to use this credit

See what the contracts say to a claimant, a seller and an integrator right now, next to what happened when the same calls were sent on-chain.

Simulated with eth_call against the live contracts. Nothing is sent.

Verdict for each use

CreditGate.check at block 50,169,760, vintage 2020

General use

Buying, retiring or claiming for any voluntary purpose.
Refused
Under watch

The project is under watch: the registry put it on hold or withdrew it, or an AI-proposed integrity event is in its dispute window.

UnderWatchchecked at vintage 2020event 0x667c3f…1ab9

CORSIA First Phase

Airline offsetting under ICAO CORSIA First Phase (2024–2026): eligible programme, vintage 2021–2026 and a letter of authorization on record.
Refused
Under watch

The project is under watch: the registry put it on hold or withdrew it, or an AI-proposed integrity event is in its dispute window.

UnderWatchchecked at vintage 2020vintage 2021–2026, letter of authorization requiredevent 0x667c3f…1ab9

Türkiye ETS offset

Offset use under Türkiye's emissions trading system: credits at most five years old, programme allowlist.
Refused
Under watch

The project is under watch: the registry put it on hold or withdrew it, or an AI-proposed integrity event is in its dispute window.

UnderWatchchecked at vintage 2020at most 5 years oldevent 0x667c3f…1ab9

VCMI claim

Corporate claims under the VCMI Claims Code.
Refused
Under watch

The project is under watch: the registry put it on hold or withdrew it, or an AI-proposed integrity event is in its dispute window.

UnderWatchchecked at vintage 2020vintage 2016–anyevent 0x667c3f…1ab9

Integrity events

Every event ever opened for this project, oldest first. AI-proposed events are evidence for review, not findings: they act only after a reviewer countersigns or the dispute window closes.

Registry holdRegistry, proven by zkTLS, recorded 23 Oct 2026, 10:05 UTC
Active

The registry put the project on hold.

Active since 23 Oct 2026, 10:05 UTC.
Forest loss detected, 2.06% haircutAI oracle: satellite detector, proposed 23 Oct 2026, 10:06 UTC
Proposed, dispute window open

Satellite imagery shows forest loss inside the project boundary (a possible reversal). Confidence 55%.

Dispute window closes in 11d 14h
Input hash
0x0a29ef…7815abf6
Model hash
0xd73197…83a37ec1
Output hash
0x44364e…8b8a7c24
Oracle attestation
0x6d23c6ff…29c9ca93
Proposed in
0x0c35f850…97798b42
Evidence bundle
3d1834d85ea0….jsonverify

Where the credits are

From issuance to claims, read from Verra's registry on 21 Oct 2026 and from the contracts now.

Issued
6,307,759credits in 9 batches, vintages 2016–2020
Still held
2,531,411listed on exchanges, while the gate refuses them
2,502,819in other registry accounts
Retired
1,273,529t in 294 retirements, all time
269,576t in the last 12 months (39 retirements), 3% with no public beneficiary
On-chain, now
No escrow orders or claims on this project yet.

Who retired them, last 12 months

Beneficiary, as published by the registryTonnesRetirements
Fleetcor Deutschland Gmbh260,22327
Not disclosed7,1486
Evertreen end users1,9991
Wolf Safety Lamp Company Limited1161
OSTRACA501
Greenify Ltd.403

Names appear exactly as the registry publishes them; personal ID numbers are redacted. A name here says nothing about that buyer's conduct.

Most recent retirements

RetiredTonnesVintageCheck
17 Sep 20265,8032017serial
17 Sep 20263,1062017serial
17 Sep 20264,3242017serial
17 Sep 2026562017serial
17 Sep 20264,1342017serial
17 Sep 202610,6162017serial

Source file for this project, sha256 0xf24578e4be…

Registry proof

The project's status comes from Verra's own API response, proven with a zkTLS proof and verified inside RegistryOracle. The request it accepts is pinned byte for byte: URL, method, headers, body and the extraction pattern.

Project status

Extracted fields
projectId 2252, stateCode ON_HOLD, modifiedDate 2026-03-25T20:27:17
Proven at
23 Oct 2026, 10:05 UTC
Proof hash
0x51f0fa7e…efb922d9
Authorization on record
no letter of authorization in the registry record
Submitted in
0x645d0e01…4fc9fbd7
Recheck the proof signatures and the pinned request

Retirements proven on-chain

No retirement of this project has been proven yet.

Satellite evidence

Sentinel-2 dry-season composites inside the boundary filed with the Verra registry, 2023 against 2025. The detector flags canopy loss pixel by pixel; Hansen Global Forest Change is the independent yardstick.

False-colour composite, 2023-07-01 to 2023-10-312023 dry season
2023-07-01 to 2023-10-31
False-colour composite, 2025-07-01 to 2025-10-312025 dry season
2025-07-01 to 2025-10-31
Detected loss (red) and Hansen-only loss (cyan)Detected loss
40 m pixels, EPSG:32722
detected by the modelHansen loss the model missedno clear observationfalse colour: SWIR2 (B12) red channel, NIR (B08) green, red (B04) blue; forest = green, cleared or burnt ground = magenta / pink

What the detector found

3,269 hacanopy loss, 95% interval 2,996–4,436 ha (2.06% of forest)
2.11M tCO₂e at risk (IPCC Tier 1, 646.2 t/ha), interval 741k–3.97M

Pre-registered rule met (validFraction >= 0.5 AND (lossPct >= 1.0 OR lossHa >= 1000)): Forest loss detected, 2.06% haircut proposed at 55% confidence.

Agreement with Hansen GFC here

0.42precision
0.81recall
0.56F1 (chance 0.014)
0.98ROC AUC

Detected 3,269 ha against 1,710 ha in Hansen; 98.0% of forest pixels had clear observations.

Reproduce it

Model
gradient-boosted trees (100 x 15 leaves), isotonic calibration, threshold 0.25
Model sha256
0xa5d14fad…97a9157a
Output hash
0x44364ef7…8b8a7c24
Pre-registration, controls and scorecard

What public notices say

The notice reader extracts events from public statements. Every quote below occurs verbatim in the source document; outputs that cannot be traced to the text are rejected.

Crooked Carbon Business: Carbon offset projects in Portel, BrazilREDD-Monitor, 13 Nov 2025
Registry hold
In September 2023, Verra suspended the projects.
Issuance of new credits is suspended.
3 of 3 runs agreeconfidence 100%Source documentsha256 0x56fe240bd0…

Transactions

Everything sent on-chain about this project, including the calls the contracts refused on purpose.

WhatByResultTransaction
Registry status proven
2252 ON_HOLD
RegistryOracle.submitProjectStatus
watcherAccepted0x645d0e01…4fc9fbd7
Attestation
REVERSAL_SUSPECTED 2252 206bps
EAS.attest
oracle satAccepted0x0c35f850…97798b42